Route Plan Drafting
A defended line from one point to another
Route plan drafting is the core of the practice and the service most clients commission first. We take a start point and an end point, confirm them on the ground, and then build a corridor that a person can actually walk. The draft records distance, elevation change, average grade, expected moving time and the surface character of each segment. It also records the places where the line leaves maintained ground, because that is where permission questions usually begin.
Every plan sheet carries a legend, a scale bar and a set of bailout notes. A bailout note names the nearest road, the direction of travel to reach it and a realistic time for that exit. Some clients never use them. The point is that they exist before the weather turns, not after. Drafts are delivered as a dated PDF package plus a field edition with larger type for use on a clipboard in poor light.
Revision rounds are built into the scope. A first draft is expected to be interrogated, and we would rather hear objections at the bench than on the ridge. Two revision rounds are standard, and a third is added when a permit reviewer requests a change to the corridor.